Current rates will be put back if it doesnt work, could a timeframe be added and the metrics to judge if it works / doesn’t work? So when the change is a success and a keeper and when a fail and changed back to the old slope.
So define clear success / fail criteria and a time period after which the adjustment will be evaluated.